Civil Engineer with seven years of experience actively looking for a job

Description

Profile Summary
• A competent professional with over 7 years of experience in Civil Engineering Projects
• Established a whole operation with the scope of work, quality, cost control, timely execution with an integral concentrate on safety and health & environmental issues
• Administering weekly progress meetings with subcontractors frequently to solve any site related issues
• Skills in administering project activities from conceptualization to execution including technical specifications, ordering, following up way to obtain recycleables, stage inspections, scheduling, progress monitoring, site and manpower planning
• Proficient in anchoring on-site activities, ensuring completion of project inside a set cost & time and through effective resource utilization
• Managed projects such as for example One at Palm Jumairah, Museum into the future, Dubai water canal project, MBR City – D1, Dubai
• Skilled in engineering, timely smooth execution monitoring all Civil Substructure Superstructure Works, Waterproofing, Concrete, Block Works, Plaster Works, Insulation, Stone Cladding, Painting, Flooring, Roofing & Paving Works
• Knowledge in equipment selection, capacity planning, resource planning & mobilization, costing and quality assurance in order to ensure top & bottom-line profitability
• Proficient in accomplishing construction projects with a flair for adopting the present day construction methodologies in coordination with Architects, Consultants and Contractor
• Skilful in AutoCAD, MS Office, STAAD Pro & Primavera P6
• Excellent relationship management, communication skills with the skill to network with engineering, clients and subcontractors representatives on a regular basis to solve any issue
Work Experience
Site Engineer with Kabbani Construction Group, Dubai, UAE April 2019 – May 2021
Projects: One at Palm, Museum into the future, Dubai, UAE
Key Result Areas:
• Implemented the project program on-site within an organized and cost-effective manner by following project plan, quality standards, budget within the agreed timeframe
• Led & ensured the ongoing work is really as per the approved shop drawing, scope & project specifications
• Ensured the Materials Submittals, Method Statement & Risk Assessment (MSRA), Material Safety Data Sheet (MSDS), Drawings are submitted & approved by the consultant
• Analysed BOQ, drawing, project specifications and highlighted any discrepancies or variations to raised management
• Prepared mock-up on-site and represented to client or consultant as had a need to get material & process approval
• Assigned day-to-day targets to Subcontractors, supervisors, foremen, and charge hands
• Provided support in technical requirements on a construction site for subcontractors, craftspeople and subordinates
• Spearheaded meetings, site walks with MEP, HSE, finishing, Façade teams & sub-contractors to make sure project progress
• Liaised & Coordination with the Technical Department, Consultant, Sub-contractor, MEP department, material suppliers along with other third parties
• Administered & submitted WIR/MIR according to inspection test plan (ITP), piloted QA & QC inspection for work & materials approvals
• Prompted quick responses in the closing of SOR & NCR while propositioning the corrective action proposals
• Delivered observation and violation letters to contractors and sub-contractors for non-conformance activities
• Reviewed method statements, work-specific project quality plan & quality control plan according to specifications of contract document
• Contributed as In-charge of quality management in compliance with standard specifications & drawings
• Managed and prepared the look-ahead program, manpower forecast alongside monitoring productivity of every trade
• Prepared monitored and updated information linked to:
o Daily manpower report, allocation report, work & material inspection schedule, ISO report for biannual audits
o Daily Productivity Report, Progress Report, Concrete Logs & Documentation
o Project progress reports, variation reports, materials on-site report, tolls on-site, and machinery reports
o Monthly manpower cost reports and material consumption reports
o Toolbox talk (TBT) to all or any the workers, weekly quality and HSE training
o Environmental protection measures & reporting of any hazards/incidents to reduce accidents
• Managed subcontractors day to day activities, evaluating performance, issuing updates for payment
• Established product development strategy from an engineering perspective
• Managed all construction activities including providing technical inputs for methodologies of construction and coordinating for site management activities
• Provided completed works to client/subcontractors and issuing of a handover certificate
• Performed snagging & de-snagging before handing to the customers
• Ensured HSC policy on each site, coo

Apply for this job: Click here

Menu